Luxury Waterfront development Infrastructure Package

An orange excavator is drilling into the ground at a construction site near a marina, where several boats are docked, with hills visible in the background. Workers in orange uniforms are nearby.


 Fort Bovisand

Installation of new foul and surface water drainage, alongside reduction of the single access road to underside formation level – forming a key enabling phase at this cliffside, heritage-sensitive site. With listed monument status, SSSI designation, and logistical constraints including UXO risk, these works were critical to unlocking safe construction access and progressing Phase 2 of the redevelopment.

project details

Project TypeInfrastructure
LocationPlymouth
Completion DateJune 2025
Value£400K